UMBC Observatory Wiki!
Observing Session - POST PAINT
Time
20230726T1800-0000
Peoples
Roy, Onkar, Connor
Places
PHYS 401, 433C, Dome
Goals
Put control room back together
Confirm operation of scope, DC, CC
Discuss seeing and tracking studies
Log
Put control room back together
Big differences
Bookshelves next to each other
No filing cabinet
Minifridge on counter – not yet filled with beverages
Dream guide stuck to side of monitor
Scope works!
Poorly aligned
Pointed at Moon (took pics!)
Then refined pointing on Vega
Trying to take seeing frame
Dubhe
Theta Drac
Eta Herc
Pi Herc
Broadly seeing seeing disc of 5''-7''
Taking a series of images at low exposure of Pi Herc
Also live stacking Pi Herc to compare
Jabbah in Blue Horsehead Nebula
Not much to see, other than the double star Jabbah
Moved to M57 – the Ring Nebula
Moved to M51, but it wasn't very nice
Wrote about PHD2 in wiki
Notes
Onkar has lots of ideas
We should keep track of humidity and temperature
ToDo
Data
Normal place
Weather
At 2200
29C in dome
24C in control room
Humidity reported at 72%
At 0000
28C in dome
23C in control room
Humidity at 77%
Related content
Direct Questions/Concerns to Roy Prouty (roy.prouty@umbc.edu)