Technical
Technical Overview
Project Goals of the Technical Team
Recognizing the project is functionally driven, UMBC's Technical Team's primary goal is to support the SA Project and address all project related technical needs. Our Secondary goals are to:
1) Prepare ourselves so we can provide a high level of support as each module goes live.
2) Partner with the Functional Leads to learn how system is being configured/designed so we can provide a high level of support as each module goes lives.
Progress
Upgraded to V9.0
Through OIT's partnership with the functional departments (CPS, Grad, Ugrad), UMBC successfully upgraded the Campus Solutions-Recruitment system from version 8.9 to 9.0.
Data Conversion
In partnership with the functional units, the Technical staff is writing conversion programs to move Legacy data into the PeopleSoft environment.
New Hardware
To provide the processing power needed to support Student Self-Service, Faculty Self-Service and internal staff processing of HRMS and SA functions within 1 environment, UMBC is moving towards a scaleable physical multi-tiered environment. UMBC has procured, installed and configured the new Architecture. Currently, the project teams are testing HR and SA-Recruit on 1 database using the new Architecture.
Personnel
Name Project Role
Siri Flocke |
Consultant - SA Data Conversion Lead |
Tracy Barnes |
Consultant - SA Technical Lead |
Bob Andrew |
Consultant - Integration Team |
Jen Keller |
Consultant - Integration Team / Istrategy |
Ed Kelly |
Consultant - Technical Team |
Kevin Joseph |
Integration Team - Lead |
Kathy Blank |
Integration Team / Conversion |
Kashka Donaldson |
Integration Team / Document Imaging |
Collier Jones |
Portal Architect Team |
Todd Haddaway |
PS / DBA Admin - Lead |
Chris Sutherin |
PS / DBA Admin Team |
Jeremy Gude |
PS / DBA Admin Team |
Steven Ostrove |
PS Admin Team |
Dave Freeman |
PS Admin Team |
Arnold Foelster |
SA Technical - Project Lead |
Cheri Putro |
SA Technical Team |
Dina Caddeo |
SA Technical Team |
Betty Blanchette |
SA Technical Team |
Patrick Simon |
SA Technical Team |
Laura Brown |
System Admin - Lead |
Tim Champ |
Unix System Admin Team |
Derek Eichenberg |
Unix System Admin Team |
Jesse Beauman |
Windows Admin - Lead |
Matt Boone |
Windows Admin Team |
Updates & Timeline
The technical team's timelines are driven by the overall project plan. Our primary areas of responsibility include:
- On-line development per system specifications
- Reports per system specifications
- Interfaces per system specifications
- System Architecture
- Adequate Response times
- Security Administration
- Application and Facilitation of Patches and Fixes
- Implementation and Production Support
It's important to note that all of our responsibilities imply a partnership with the Functional Departments and our Consulting Partners.