Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 2 Next »

Attendance Onkar, Gabriel, Shreyansh, Nathan, Meyer, Eric, Roy

Date/Time 11/30/22 12:00-6:00PM

Spaces Occupied: 401, Control Room, Dome

Goals

  1. Dry run gam removal
  2. See if baffle tube thing can be removed easily
  3. get MAC addresses for the security cameras


Log

Gam:

  1. just straight up removed it
  2. used the erik gam removal apparatus to lower gam carefully down from telescope base to a lower position
    1. can be described as an elevator or forklift
    2. rule of thumb four people needed for this operation
      1. one on the apparatus brake
      2. one on the apparatus wheel
      3. two physically spotting the gam (holding its sides so it doesn't fall
  3. carried physically to Meyer lab in 306 for cleaning and inspection
  4. "scope without the GAM, the central black bit is actually a flange that holds the primary light baffle, which we have now removed." - meyer

Baffle Tube Thing:

  1. also straight up lowered and removed
  2. in Meyer possession to be cleaned aggressively with yard hose

MAC Addresses:

  1. WIP, see comments from Roy and Gabriel


Onkar and Eric will performe functions test of scope on Thursday at 10:00AM

  • No labels