UMBC Observatory Wiki!
Open House October
Attendance 45 people
Date & Time 10/6/2022 7:30pm
Spaces Occupied 401 Control room and Dome
Achievements
6:00pm cleared out Control room
6:30p-7:00pm, Jackson, Onkar, and Matt cleaned out Dome (moved ladders)
Attached Data Cable (both ends) to Data Computer
Attached CMOS to Instrument box and connected to data cable
Checked with SharpCap that CMOS was connected
Roy inspected opening of Mirror Doors
No issues
Attempted to point at Vega
Due to clouds and lack of determination, gave up
Attempted to point at Moon – this was a bad idea
Clouds obscured things
Attempted to point at Saturn – failed
Returned to Vega
All clouds
Stopped trying around 8:20p
Slewed to Zenith
Closed Mirror Doors
Open House Tours
Opened Mirror Doors
Pointed at Vega
FOUND IT
Went to Jupiter
Went to Moon
Found Tycho
Saved 50GB worth of frames, zipped and moved to Shared Drive
Slewed to Zenith through DFM TCS > Movement > Offset/Zenith, Apply Zenith position & Start Slew
Closed Dome Doors
Moved ladders back
To HOME DOME
Connect ASCOM Dome Control (from Start Menu)
Connect via panel
Switch front panel switch to Auto Dome and un-halt motors with motor driver chassis on
Notes
Still don't know why mirror doors messed up last time
North and South open first, close last
East and West open last, close first
Connecting Data cable to data computer before CMOS seems to be correct Order of Operations
Related content
Direct Questions/Concerns to Roy Prouty (roy.prouty@umbc.edu)