Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

...

6)      After shipment has been verified, stamp a stamp a copy of the invoice with the "A & R" stamp , and initial and date. (Usually done by a student)
         Also Student needs to stamp same copy of the invoice with the "Good Services" stamp, and then punch time on the back of last page 's back both original and copy of the invoice.
         [Note: Stamp the page of the invoice showing the Subtotal]

7)      After shipment has been verified, sign and date on the "Good Services" stamp.
         (Done by staff member who was authorized to sign for the 7110710 account)

...